We're a group of second- and third-year drafting students at Fort Lauderdale High School.
DESIGN INFO:
The design is composed of 1" PVC pipes pre-assembled in two upside-down U-shapes. Three tarps are already attached to the top. The structure is opened up, and then additional tarps can be added along the sides. Once all the tarps are on, the structure is hammered into the ground. Multiple structures can be lined up in a row for more space and further protection.