St. Seelos/St. John Adaptive Reuse Feasibility Study

Overviewteamupdatesworkspacecalendarfiles 

In this project, we were asked by the Hands on Network to produce a feasibility study to determine the necessary work and cost to renovated and reuse St. Johns Catholic School to house volunteers and to store and distribute building materials.

The GCCDS produced schematic plans to determine the program and capacity of the buildings. The buildings were assessed to determine the necessary repairs and modifications for the proposed program. The GCCDS described the necessary construction and produced a preliminary cost estimate.

Location

Biloxi, Mississippi
United States
 

Interested in hosting your competition on Worldchanging? Contact Us and tell us about your competition!

 

Who's online

There are currently 5 users and 828 guests online.

Online users

  • Lisa Smyth
  • gerryreilly
  • zsofia_marton
  • Li Pires
  • audreygalo
Website Design by Eben Design | Logo Design by Egg Hosting | Hosted by Amazon AWS | Problems with the site? Send email to tech /at/ worldchanging.com
©2006-2010 Architecture for Humanity - all rights reserved except where otherwise indicated
 
Hosted on     Supported by