BACKGROUND
St Louis de Gonzague , one of the most prestigious schools in Haiti, was founded in 1890 and initially located at rue du Centre, in downtown Port-au-Prince for students between the ages of six and 12. By 1930, St Louis de Gonzague offered degrees for secondary school. In the early 1970s, the director at that time, Brother Ephrem Le-Mat, built a new campus on previously acquired land in Delmas 33. Since then, the secondary school has moved to that new campus. All facilities on the campus was affected by the January 12, 2010, earthquake. The primary school was moved to the Delmas premises.
DESCRIPTION
The chemistry/physics classroom building was damaged during the earthquake as well, and was considered for rehabilitation. A site visit was conducted to determine the extent of repairs needed for the structure.
The existing single story building provides approximately 463m2 (4983 sq.ft) accommodating the following spaces:
- 2 Lecture Rooms
- Physics Laboratory
- Chemistry Laboratory
- Storage Area
SITE INSPECTION
A walk-through was conducted inside and outside the structure to (1) visually assess the structural damage and (2) form a basis for any repairs. The vast majority of structural damage occurred to interior and exterior masonry shear walls. No destructive testing was performed to determine the nature of concealed conditions.
MAIN BUILDING DATA
- Building dimensions: 10 meter wide x 48 meter long
- 1-story concrete columns that support reinforced concrete roof trusses
- Infill masonry walls beneath concrete roof trusses, 4 interior locations in transverse direction, 3.6 meters tall
- Reinforced concrete, folded plate roof slab, supported on top of the reinforced concrete roof trusses
RECOMMENDATIONS
In order to improve the safety and performance of the structure, as defined by the 2009 International Building Code, we recommend the following:
- Perform a geotechnical investigation to evaluate any necessary soil-related issues.
- Perform a structural analysis in accordance with 2009 IBC seismic standards and develop drawings and details necessary to repair the structure.
- Remove the 2 exterior transverse masonry end walls. Rebuild these 2 exterior transverse masonry end walls with reinforced masonry shear walls, relocating them inward to beneath the end reinforced concrete columns and concrete truss. Create a physical connection between the new walls and existing concrete structure. New foundations will be necessary beneath these 2 walls.
- Remove the 4 interior transverse masonry walls. Rebuild the 4 interior transverse masonry walls with reinforced masonry shear walls, and create a physical connection between the new shear walls and existing concrete structure.
- Remove at least 4 masonry wall sections between the concrete columns along each longitudinal perimeter wall. Rebuild these longitudinal wall sections with reinforced masonry shear walls, and create a physical connection between the new shear wall and existing concrete structure. Preliminary structural seismic calculations indicate the total length of shear wall needed in the longitudinal direction is as follows for each thickness of block under consideration:
- 20 cm block: 38 meters
- 25 cm block: 30 meters
- 0 cm block: 24 meters
- Remove interior slabs-on-grade as needed. Provide proper compaction of underlying soils per geotech recommendations, replace interior slabs-on-grade and theatre seating as needed.
Sources: Wikipedia.org, Rick Ehlert's site visit Report-April 2011





Comments
Dear Karl
My name is Amina Koroma and i am a first year architecture student research of regeneration projects in the aftermath of natural disappears, of wich geographical surveying is very important.
In accordance to the Haiti earthquake the damage must of been completely devastating to roads and the foundation of existing buildings, therefore I would like to enquire with St Louis about the extent of damage with the foundation that the building was laid upon and the surrounding area of the buildings proximity? what results came from it, and how did you apply these results into the reconstruction of the building in regards to making the foundations more resistant to future earthquakes
Excellent posting. Undoubtedly you are an expert when it comes to this writing. This is absolutely the first time I visited your site and to tell the truth it succeeds in making me visit here now and then.Water Damage Kane County IL
People get used to cycling is one positive thing. With cycling we contribute indirectly participate in the efforts to save the current oil supply is running low.
Water damage Evanston IL
Thanks Good Article.