Let's plan a date for our LEED Charrette, and maybe finalize the design and start dividing up the presentation work.
Also, if people need to arrange smaller meetings we can do that here, too."
Wed, 2010-03-03 14:17
Hey guys looks like I was wrong about some of the deatils on ramp landings, they need to be at least 60" long and occure every 30' not every 12' for a 1:12 slope. http://www.access-board.gov/adaag/html/adaag.htm#4.8
http://doodle.com/fivbdxv575s84dr5
Let's plan a date for our LEED Charrette, and maybe finalize the design and start dividing up the presentation work.
Also, if people need to arrange smaller meetings we can do that here, too."